אל-הר
Home About Projects – Engineering Projects - Residential Fields of activity Specializations Contact us  

Specializations

El-Har Company is unique in its professional know-how, management methods and the reliability which the company implements in its work.
The company's employees are professional and qualified and execute complex engineering and logistical projects that are mostly characterized by limited schedules.
The team applies the latest and most updated implementation methods and technologies, is involved in the design process and provides original on-site solutions to different problems. El-Har specializes in "Fast Track" work method that is applied when design in a very short timeframe is required and/or in an integrated manner.



Top Down method
nderground basements in which the basement ceilings are implemented from the top down using gradual excavation. The method is required when no land anchors can be implemented in the hole lining walls. The walls serve to support the lining walls. Excavation works are implemented through openings in the walls using equip...

Steel construction
ience in the implementation of frame elements from steel, starting from specific and single elements therefore integrated construction systems and up to the entire complex of the building frame.Upon receipt of the plans from the building designers, El-Har takes care to provide detailed design of steel elements ("s...

Membrane method
external plant or in a special set up for that purpose in the construction site. The membrane elements serve to cast ceilings, and to cast walls in the building, especially exterior walls, usually with stone cladding. Ceiling membranes - are usually meant to bridge over large areas, large openings, laid in place in t...

Bernowitz method
for the purpose of building exterior walls with stone cladding, when the cladding is integrated in the formwork and casting works. The façade walls are cast in steel forms from both sides of the wall in precise dimensions that also include required openings.The stone is placed on the exterior walls in the designated sp...

Pre-stressed concrete
ete is usually meant to bridge between large openings, while increasing the element tolerance and reducing its dimensions.Pre-stressed concrete is a type of reinforced concrete that is used to create a reinforced artificial load in the element when this artificial load resists the element's live loads and actually o...

Prefabricated elements
elements that are manufactured in an industrial plant and assembled afterwards in their place in the construction site.The formwork, reinforcement and casting works are implemented on the prefabricated element in an exterior plant or in a plant set up for that purpose in the construction site.The construction with pre...

Climbing forms
ements in the frame of the building using steel or wooden forms and/or a combination of both, manufactured and assembled specifically according to the required element geometry. The use of this method is meant for vertical reinforced concrete elements in a building that have to be repeated in each floor in an identical...

Modular forms
g frame using steel forms and/or a combination of steel and wood and/or a combination of aluminum elements.                                   &nb...

Infrastructures, soil and foundation works
nderground infrastructure works required for the purpose of constructing the building. the Company engages in all demolition works when required, support and reinforcement of façades for preservation, construction of different types of lining walls, including slurry walls, piles, and anchoring works combined in them. T...








2 Kreminitsky St., Tel Aviv, Israel, 67899 • Tel. +972-3-5623881/2 • Fax. +972-3-5626646 • el-har@el-har.co.il

Built by Indigo Design & Websites